Utilities & Infrastructure
Linville WTP Design & Construct
Completion Date: April 2020 Practical Engineering delivers new Water Treatment Plant for Linville The regional Queensland township of Linville [...]
Bundamba Waste Water Treatment Plant Screw Conveyors
Completion Date: April 2016 Bundamba Waste Water Treatment Plant Screw Conveyor System Practical Engineering was awarded the upgrade project [...]
Axis 33 Substation EWP
National High Voltage Live Works Forum Practical Engineering is proud to have presented our Axis 33 Substation EWP to the [...]
500 kVA Generator Self Bunded Fuel Tanks
Completion Date: May 2015 Practical Engineering is proud to announce the completion and delivery of five generator set bases [...]
Self-Erecting Gantry Crane
Completion Date: January 2014 Practical Engineering is often called upon to develop innovative solutions for clients where all other [...]
Molendinar Water Treatment Plant Upgrades
Completion Date: June 2017 Managing and maintaining ageing infrastructure is one of the most common challenges facing the utilities [...]
Hinze Dam Fishway Compliance Upgrade
Completion Date: May 2017 The Department of Agriculture and Fisheries sets dam operators with guidelines and minimums for fish [...]
Maroochydore And Murrumba Downs Grit Pump Station Upgrades
Completion Date: November 2017 Managing and maintaining existing infrastructure is a core part of the business of sewage treatment, [...]
Wivenhoe Dam Trash Screen Crane 25 Yearly Refurbishment
Completion Date: August 2017 Seqwater is the Queensland Bulk Water Supply Authority and manages the SEQ Water Grid – [...]
Wivenhoe Dam Gate Winch Inspection Refurbishment and Testing
Completion Date: June 2017 Seqwater is the Queensland Bulk Water Supply Authority and manages the SEQ Water Grid – [...]
NSI WTP’s Back Up Power Systems
Completion Date: November 2017 Working on North Stradbroke Island is hardly a chore and working on Seqwater’s water treatment [...]
Wivenhoe 79t Portal Crane
Practical Engineering was contracted by Seqwater in June 2015 to undertake the Major Structural and Mechanical Refurbishment and Recertification of the Wivenhoe Dam 79t portal crane.
Energy and Resources
As1210 Fuel Gas Heater Pressure Vessels
Practical Engineering has successfully completed a further two Fuel Gas Heater Pressure Vessels for Thermal Electric Elements to be delivered [...]
Oil Heating Skid Prototype
Since late last year, Practical Engineering has been working on an Oil Heating Skid prototype for a large energy provider. [...]
Low Point Drain Trailer
Coal seam gas (CSG) gathering systems require many kilometres of pipelines and distribution networks, as the pipelines follow the surface [...]
Regeneration Heater Pressure Vessel
Completion Date: May 2015 In October 2014 Thermal Electric Elements engaged Practical Engineering for the design, RPEQ verification and [...]
Industrial
Port Of Brisbane Hardwood Chip Conveyor Design and Construct
Completion Date: November 2017 Increasing the rate of production, decreasing the costs of production and expanding capabilities are among [...]
RTG-65 Dual Cranes Design and Commissioning
Completion Date: September 2017 As a mechanical engineering specialist, Practical Engineering is generally not associated with roadworks. However, we [...]
5 & 20t ROVER Prototype Development
Practical has teamed up with Verton Technologies to help turn the company’s vision for a safer crane industry into [...]
Food Processing Line Upgrade
Completion Date: June 2017 Practical Engineering’s highly qualified and innovative team was recently engaged by a south east Queensland [...]