Project Description

Completion Date: April 2016

Bundamba Waste Water Treatment Plant Screw Conveyor System

Practical Engineering was awarded the upgrade project to the Queensland Urban Utilities (QUU) Bundamba Waste Water Treatment Plant Screw Conveyor System in 2016. QUU engaged Practical to provide advice on improving the system in order to mitigate current efficiency issues experienced due to breakdown and back flow problems. Using our methodology of creative thinking and practical solutions, Practical was able to demonstrate a redesign option that improved both flow rates of sludge through the conveyor whilst also reducing the frequency and likelihood of breakdown. The project was delivered, installed and commissioned on time and meant minimum down time in production.

For contact details, please call (07) 3875 2133.