28 04, 2021

A Very Practical Tank Design

By |2021-04-28T09:13:19+10:00April 28th, 2021|Categories: Blogs, Utilities and Infrastructure|Tags: , , , , , , |0 Comments

Vortex Group operates in some of the harshest environments across the country and needs its equipment to perform regardless the conditions. Working in collaboration to design a resilient tank [...]

21 04, 2021

Practical Engineering Provides Another Speedy Design to Meet Client Delivery

By |2021-04-21T08:51:22+10:00April 21st, 2021|Categories: Blogs, Industrial|Tags: , , , , , , , , , |0 Comments

Mud Cube Skid Designed in One Week Practical Engineering recently partnered with sludge dewatering specialists Conhur to design, certify and draft a new Mud Cube Skid. It sounds straight [...]

18 02, 2021

Fuel Test pressure Vessel Design and Design Verification

By |2021-02-18T08:06:22+10:00February 18th, 2021|Categories: Blogs|Tags: , , , , , , , , , , , |0 Comments

Practical Engineering Australia can meet your needs for AS 1210 pressure vessel design and design verification for all shapes and sizes, but did you know we also design tanks [...]

11 02, 2021

6m Duct Articulating Extension Arm

By |2021-02-11T08:01:56+10:00February 11th, 2021|Categories: Blogs|Tags: , , , , , , |0 Comments

Practical Engineering were engaged by Fantech Pty. Ltd. to design a 6m articulating steel extension arm that would support Ø500 ducting to extract diesel fumes from V/Line trains while [...]

20 01, 2021

Backwash Drain Line Air Vent Design and Construct

By |2021-02-10T11:37:55+10:00January 20th, 2021|Categories: Blogs, Utilities and Infrastructure|Tags: , , , , , , , , |0 Comments

Practical Engineering Australia was recently engaged by Seqwater to undertake an investigation and provide a solution for preventing an air pocket evolving in the backwash drain line during a [...]

2 11, 2020

Envelope Spreader Replacement

By |2020-11-02T01:06:02+10:00November 2nd, 2020|Categories: Blogs, Industrial|Tags: , , , , , , , , , , , , |0 Comments

Practical Engineering were engaged by Black Rubber to repair and replace the overhead rails inside and outside of the autoclave to allow vulcanisation of the tyres in their Michelin [...]

27 09, 2020

Elevated Walkway to Passenger Boarding Bridge Edge Protection Barrier

By |2020-09-27T23:51:23+10:00September 27th, 2020|Categories: News, Utilities and Infrastructure|Tags: , , , , , , , , |0 Comments

Practical Engineering Australia was recently engaged by Port of Brisbane Pty Ltd to design a temporary edge protection system to AS/NZS 4994.1:2009 - Temporary edge protection, for the new International [...]

27 07, 2020

Freestanding Crane Runway

By |2020-07-27T04:10:58+10:00July 27th, 2020|Categories: Blogs|Tags: , , , , , , , , , , , |0 Comments

Practical Engineering Australia was recently engaged by Crane Maintain to complete the detailed design of a freestanding crane runway to Australian Standards, suited for a 5t single girder overhead type [...]

20 07, 2020

Floating Pontoon Robot

By |2020-07-20T04:38:25+10:00July 20th, 2020|Categories: Blogs|Tags: , , , , , , , , , , |0 Comments

Practical Engineering Australia (PEA) recently had the opportunity to work with Matthew Dunbabin and his research team at QUT. They had been engaged by Seqwater to design and manufacture a floating pontoon robot. Seqwater’s Autonomous [...]

Go to Top